Jobsite description and CHRYSO expertise
Built in Turkey, the Eurasia tunnel is a tunnel linking Asia to Europe representing an investment of 1.25 billion US dollars.
This project requires a production of 300,000 m³ of used concrete. CHRYSO®Optima 100 is used to obtain a water/cement ratio of 38%, excellent workability, ease of pumping and exceptional surface quality.
CHRYSO®Air G100 is used to achieve a stable air content of 6%.
Used products
- CHRYSO®Optima 100
- CHRYSO®Air G100
Project participants
Owner: AYGM (Ministère des transports)
Constructor: YAPI MERKEZ, SK E&C