Jobsite description and CHRYSO expertise

Built in Turkey, the Eurasia tunnel is a tunnel linking Asia to Europe representing an investment of 1.25 billion US dollars.

This project requires a production of 300,000 m³ of used concrete. CHRYSO®Optima 100 is used to obtain a water/cement ratio of 38%, excellent workability, ease of pumping and exceptional surface quality.

CHRYSO®Air G100 is used to achieve a stable air content of 6%.

 

Tunnel-Eurasia

Used products

  • CHRYSO®Optima 100
  • CHRYSO®Air G100

Project participants

Owner: AYGM (Ministère des transports)
Constructor: YAPI MERKEZ, SK E&C


Other references

SAS iTower Hyderabad
Real Estate

SAS ITOWER

SAS iTower is 171 meters tall edifice, spread over 10.75 acres in Hyderabad. Its South India’s tallest commercial project. It has the largest floor plate of 1,20,000 sq.ft and is infused with State-of-the-art technology for higher productivity.

Hyderabad, India
Stairway in the leonardo entrance
Real Estate

THE LEONARDO ENTRANCE

The Leonardo began construction on 17 November 2015.
It is a 55 floor mixed-use property development in Sandton, Johannesburg, South Africa that stands at a height of 234 metres.

Sandtone, South Africa