Jobsite description

 

This project consists of a 5 lanes, 760 meters long curved bridge over the Wouri river.
65 000 m³ of concrete are used.

Wouri Bridge

CHRYSO expertise

CHRYSO®Optima 145 and CHRYSO®Tard CHR used to deliver a flowable concrete, easily pumpable with a long workability retention despite temperatures up to 40°C.

Wouri Bridge

Products used

  • CHRYSO®Optima 145
  • CHRYSO®Tard CHR

Project technical challenges

Underwater casting of piles (C 40/50) at a depth of 60 meters with a workability retention of 8 hours in tropical temperatures.
Casting of the large prestressed deck segments (C50/60) with 2 hours workability retention.

Wouri Bridge

Project participants

Owner: State of Cameroon
Constructor: Sogea Satom, Soletanche Bachy (VINCI Construction)

Other references

SAS iTower Hyderabad
Real Estate

SAS ITOWER

SAS iTower is 171 meters tall edifice, spread over 10.75 acres in Hyderabad. Its South India’s tallest commercial project. It has the largest floor plate of 1,20,000 sq.ft and is infused with State-of-the-art technology for higher productivity.

Hyderabad, India
Stairway in the leonardo entrance
Real Estate

THE LEONARDO ENTRANCE

The Leonardo began construction on 17 November 2015.
It is a 55 floor mixed-use property development in Sandton, Johannesburg, South Africa that stands at a height of 234 metres.

Sandtone, South Africa